After manual AG fail-over from primary to secondary the application is not able to connect the listener name for atleast for 5 - 10 mins
The telnet fails during this time from app server, the listener ip is on muti-subnet.
At the same when i try to connect it from SSMS from a remote machine it works fine. Can someone point me any pointer to stat my troubleshooting.
Mohd Sufian www.sqlship.wordpress.com Please mark the post as Answered if it helped.