Hi,
I have a Windows 2008 R2 Always on Cluster with 3 nodes (two in the primary site and one in the DR site).
Primary Site:
-Primary Site Server1
-Primary Site Server2
DR Site 1 (to be decommed):
-DR Site Server1
Our company is planning on decommissioning the DR site. But before we do this, we want to add a 4th site to the cluster. Migrate the data...and then decommission the original DR Site.
Is it possible to have this configuration:
Primary Site:
-Primary Site Server1
-Primary Site Server2
DR Site 1 (to be decommed):
-DR Site Server1
DR Site 2 (NEW DR Site):
-DR Site Server1
IF this is possible, do I simply add the new DR site to the existing cluster (same steps as adding the first DR node to the cluster when the cluster was originally configured? or are there special steps?
Thank you.