Hi Experts,
What's the difference between these below 2 sync states
3 = Reverting. Indicates the phase in the undo process when a secondary database is actively getting pages from the primary database.
4 = Initializing. Indicates the phase of undo when the transaction log required for a secondary database to catch up to the undo LSN is being
shipped and hardened on a secondary replica.
Regards